fresh home build coming soon

Page 15 - Seeking answers? Join the AnandTech community: where nearly half-a-million members share solutions and discuss the latest tech.

skyking

Lifer
Nov 21, 2001
22,420
5,419
146
Today was the day. It rained a bit and I and the concrete company were concerned about access, so I picked up 11 tons of 3" minus and made a pad for the trucks to back into the pump.
PXL_20240927_221332112.jpg

PXL_20240927_181722672.jpg

I remembered a sleeve for the future EV charging station. I hole sawed inside and then used the end of the pipe to bore into the other side of the block, then foamed that in and pinned it with a couple of screws.
PXL_20240927_182438522.jpg
It penciled out at 29.2 yards but 3 trucks was not enough and they sent out 1 more yard.
We plumbed up the walls after the second truck, and figured we were good on that. The alignment system was outside and we had preloaded it out to have it properly prepared.
 
  • Like
Reactions: iRONic

skyking

Lifer
Nov 21, 2001
22,420
5,419
146
we were wrong. That last couple of feet and the vibrator moved the high east wall about 1.5" out of plumb and nobody spotted that.
We were cruising around with the scaffolding, setting in the anchor bolts when I spotted it.
Pulling on it with the alignment system just pulled the stakes out, and our efforts with wedging it in from the inside were fruitless.
I've done a whole lot of strange and crazy things as an excavator operator for the last 35 years, but never did I imagine this.
PXL_20240927_214557008.jpg
I had to knock down the 200 yard pile enough to get close, and I pulled on the wall in 3 places. Jacob held a 2x6 against the wall until I got pressure on it and we pulled it back into shape, then reset the alignment.
We got it done.
PXL_20240927_220847146.jpg
 

skyking

Lifer
Nov 21, 2001
22,420
5,419
146
nothing 3d, here is the south elevation.
That 4x5 window is in the well there.
Because of the hung joists in the east end, all doors are roll in with no steps and that window is right up near the joists. It will get a cover.
Screenshot 2024-09-28 6.18.39 AM.png
 
Last edited:

iRONic

Diamond Member
Jan 28, 2006
7,538
2,830
136
A wheelchair bound person's dream house!

Seriously, aging in place is a very smart philosophy for home building.
 
  • Love
Reactions: skyking

skyking

Lifer
Nov 21, 2001
22,420
5,419
146
after witnessing all the struggles my brother in law had ( and my sister), I would not create a space that did not accomodate everyone possible.
Ideally it would be a single level slab on grade rambler, but the site did not speak to that.
 
  • Like
Reactions: iRONic

skyking

Lifer
Nov 21, 2001
22,420
5,419
146
So here is what it looks like when you go find the sanitary pipes below the finish.
Tap tap tap where you know they are, the sound is different. Break the thin concrete and vaccuum it up as you go, and pry up the cookie.
There is the coupler ready to continue piping. I will stuff a rag in it and the framer can hole saw for the pipe, and put the wall up. I'll glue a short piece in there after the wall is up so he does not have to frame over it.
PXL_20241022_221630846.jpg

PXL_20241022_215237903.jpg
I leave the ones I am not concerned with below grade and out of the way of the rolling scaffolding. These ones are in a bearing wall we need to frame to get the first floor subfloor in.
I'll locate and bring up the conduit and pipe as we build out those partition walls later.
 
  • Like
Reactions: iRONic