Hold on a second here IMEC Roadmap is not practical for commercialization . It says N2 2024 and A14 2026 we are gretting N2 in 2025-6 and A14 2028-9IMEC Has A7 node being the first gen of CFET which is due about 2031 (probably 2032 realistically) and subsequently A5 in 2033 (again 2034 most likely).

