• We’re currently investigating an issue related to the forum theme and styling that is impacting page layout and visual formatting. The problem has been identified, and we are actively working on a resolution. There is no impact to user data or functionality, this is strictly a front-end display issue. We’ll post an update once the fix has been deployed. Thanks for your patience while we get this sorted.

Discussion Intel current and future Lakes & Rapids thread

Page 726 - Seeking answers? Join the AnandTech community: where nearly half-a-million members share solutions and discuss the latest tech.
So you post a picture listing four -X processors and post that -X is not going to happen in the same post? Please expand on what it is you are trying to say. Otherwise what you posted looks like gibberish. It seems like you are trying to add opinions as fact without stating your opinions.
Those are Workstation-X, not the same as HEDT-X as Their past X299. Where they did not have the Word Xeon on them.. These are Unlocked Xeons(And just a few of them)

I guess we will still wait for that Raptor Lake-X based on that monster 34C Monolithic die.
 
Those are Workstation-X, not the same as HEDT-X as Their past X299. Where they did not have the Word Xeon on them.. These are Unlocked Xeons(And just a few of them)

I guess we will still wait for that Raptor Lake-X based on that monster 34C Monolithic die.
Ah, so you are complaining about a marketing word. Gotcha. Silicon is silicon, the rest is marketing.
 
Nice to see Intel gradually beginning to compete. Having an alternative to Threadripper will be nice...IF the price is right. A bit dissapointing on the Raptor Lake refresh. That means no Intel 4 desktop products next year, or possibly at all?
 
Nice to see Intel gradually beginning to compete. Having an alternative to Threadripper will be nice...IF the price is right. A bit dissapointing on the Raptor Lake refresh. That means no Intel 4 desktop products next year, or possibly at all?
I'm really starting to think Intel 4 desktop products won't exist... at all.
With ARL desktop rumored to use TSMC 3nm, meaning a 2024 launch definitely is possible, what's the point of releasing an Intel 4 desktop processor as well, with less cores and a worse architecture? Unless you really compress the launch schedule into a 2-3 quarters...
 
With ARL desktop rumored to use TSMC 3nm, meaning a 2024 launch definitely is possible, what's the point of releasing an Intel 4 desktop processor as well, with less cores and a worse architecture?
TSMC 3nm and Intel 4 products could co-exist to meet volume. Depends on whether Intel has enough TSMC 3nm wafer allocation.
 
Desktop is rumored to use TSMC 3nm. 2024 launch is possible.
Mobile 20A could be end of 2024. Manufacturing ready 1H 2024, ~1H to ramp, ~1H to full volume, launch end of 2024 and high availability 2025.
Raptor Lake Refresh CPUs until then... Which is really not bad, because RTL is a pretty good CPU Design
 


Can any of you get a hold of a large core instance and test it for us?? According to the info. Those are all-core turbo frequency up to 3.9 GHz

Going by the L3$ Size this means that this is a 32 Core CPU.
1670519662741.png

They have a maximum of 128 Cores so that means they are running a 4S System.
 
Last edited:

Videocardz got all the slides. It confirms that HEDT is being discontinued. You could still buy the Xeon W instead.
 
That means no Intel 4 desktop products next year, or possibly at all?
In case the folks around here need a reminder of what Intel's plans looked like just 1 year ago, here's their roadmap as described at Intel's Accelerated event in the summer of 2021. Intel 4 was supposed to ramp up in 2022 and deliver products in H1 2023. And that's the updated timeline, after they had already announced a ~12 month delay at the end 2020.

1670525592927.png

It feels like 2017 all over again, only this time at least they have better contingency plans both in terms of design and manufacturing. Looking forward to Intel 7+ in 2023.
 
In case the folks around here need a reminder of what Intel's plans looked like just 1 year ago, here's their roadmap as described at Intel's Accelerated event in the summer of 2021. Intel 4 was supposed to ramp up in 2022 and deliver products in H1 2023. And that's the updated timeline, after they had already announced a ~12 month delay at the end 2020.

View attachment 72529

It feels like 2017 all over again, only this time at least they have better contingency plans both in terms of design and manufacturing. Looking forward to Intel 7+ in 2023.
Intel 4 is being used in other products than just Meteor Lake IIRC, horse creek falls.
This timeline does NOT indicate that Intel claimed MTL was going to be delivered in 1H 2023.
And Intel, so far, HAS followed that timeline. They claimed Intel 4 would be manufacturing ready by 2H 2022... and ye that is what they just very recently claimed they were at.
Intel definitely faced delays, but from what they specifically "announced" there are no delays at all. They never committed to a date for Meteor Lake other than 2023. I highly doubted they wanted to release ANOTHER alder lake refresh after raptor lake.
I think they have been pretty careful with their commitments though, with respect to release dates, with Pat Gelsinger.
 
In case the folks around here need a reminder of what Intel's plans looked like just 1 year ago, here's their roadmap as described at Intel's Accelerated event in the summer of 2021. Intel 4 was supposed to ramp up in 2022 and deliver products in H1 2023. And that's the updated timeline, after they had already announced a ~12 month delay at the end 2020.
Did you see the updated version that came out this week? Not much change, but 18A was moved forward from Q3 2025 to H2 2024. Yet, you needed to highlight a delay from years ago in your post?
1670533249555.png
 
Yet, you needed to highlight a delay from years ago in your post?
Yes, I did. Funny you should call it a "delay from years ago" when it was about their Intel 4 process.

Anyway, my point was related to Intel's consumer desktop roadmap and the use of Intel 4 in their mix. If the node is in such good shape as you say, why are we getting a Raptor Lake refresh instead of a proper tick?
 
Yes, I did. Funny you should call it a "delay from years ago" when it was about their Intel 4 process.

Anyway, my point was related to Intel's consumer desktop roadmap and their use of Intel 4 in their mix. If the node is in such good shape as you say, why are we getting a Raptor Lake refresh instead of a proper tick?
Perhaps MTL is a Mobile Only CPU?
 
Nice to see Intel gradually beginning to compete. Having an alternative to Threadripper will be nice...IF the price is right. A bit dissapointing on the Raptor Lake refresh. That means no Intel 4 desktop products next year, or possibly at all?
The question is how will they "refresh" RL. It is already pushed to the max in frequency and power consumption.
 
Yes, I did. Funny you should call it a "delay from years ago" when it was about their Intel 4 process.

Anyway, my point was related to Intel's consumer desktop roadmap and their use of Intel 4 in their mix. If the node is in such good shape as you say, why are we getting a Raptor Lake refresh instead of a proper tick?
Obviously, there could be other reasons for delay than problems with the process. ML is a totally new (for Intel), product, so there could be problems with communication between the chiplets.
 