dullard
Elite Member
- May 21, 2001
- 26,026
- 4,651
- 126
And that was the origin of AMD calling intel's chips "glued together".The first Athlon 64 X2 CPUs were released in May 2005
May 25, 2005 for the Pentium D...
And that was the origin of AMD calling intel's chips "glued together".The first Athlon 64 X2 CPUs were released in May 2005
May 25, 2005 for the Pentium D...
And the AMD X2's were quite a bit faster and ran cooler using less wattage than the Pentium D.And that was the origin of AMD calling intel's chips "glued together".
And that was the origin of AMD calling intel's chips "glued together".
No, AMD did it independently. Both chips came out about the same time. AMD's implementation was much better and AMD chip sales were deservedly good.Two Pentium 4's connected via FSB, what could possibly go wrong? I guess that is Intel "innovating" though and AMD and Apple just copied it much later on.
No, AMD did it independently. Both chips came out about the same time. AMD's implementation was much better and AMD chip sales were deservedly good.
intel the innovator.. amd and apple updated it 🙂
And that was the origin of AMD calling intel's chips "glued together".
Lol...
Athlon 64 in September 23, 2003
The first Athlon 64 X2 CPUs were released in May 2005
![]()
May 25, 2005 for the Pentium D...
![]()
This is kinda getting into the weeds here. The original question we were trying to answer was: what did the Meteor Lake design teams believe about the suitability of N3 back in 2019? There's an obvious distinction between what industry observers might have said, and what TSMC actually shared with customers during that period. During the TSMC Q2 earnings call on July 18, 2019, C. C. Wei stated that:I'll point out that that article is from quite late '19. Moreover, it sources Digitimes, and while I can't find the full text of the original, they talk about accelerated plans in this article that seems to be the reference. So was the 2023 bit a prediction, or editorialization? https://www.digitimes.com/news/a20191024PD202.html
Additionally, yes, Apple didn't announce their plans till June '20, but rumors proceeded them by quite a while. Additionally, the M1 is basically an A14X. Substitute "Mac chip" with "iPad chip" if you want. Doesn't change the point.
I think we can safely assume that the teams at Intel were getting some information directly from TSMC and not just relying on whatever DigiTimes published. The first public statement from TSMC regarding N3 timelines came during the Q1 earnings call on April 16, 2020:On N3, the technology development progress is going well, and we are already engaging with the early customers on the technology definition.
In the absence of clear evidence that TSMC told customers something materially different during the prior 12 months, I tend to believe that Intel was working with accurate information.Our N3 technology development is on track, with risk production scheduled in 2021 and target volume production in second half of 2022.
Despite 5 quarters worth of consistent communication from TSMC, @witeken promptly latched onto the word "delay", claiming this was somehow a deviation from the public roadmap, and subsequently doubled down on it. Incidentally, you can also check out the editorialization from his own take on the IThome piece that he did for Tom's Hardware.Andrew Lu - Sinolink Securities Co., Ltd., Research Division - Semiconductor Analyst
Okay. My first question is regarding 3-nanometer ramp-up for second half, starting from second half next year. I recall the 7-nanometer ramp-up in year 2018 second quarter with some revenue contribution and the 5-nanometer in second quarter last year, year 2020. But it seems like 3-nanometers clearly some delay for second half next year. So I want to ask, is that because the technology difficulty, we cannot ramp up in second quarter or we don't have a big customer to use 3-nanometer at the beginning stage that's why we push back the ramp-up in second half next year? That's my first question.
Jeff Su - Taiwan Semiconductor Manufacturing Company Limited - Director of IR
Okay. So Andrew's first question, let me summarize, is asking about our 3-nanometer ramp. He notes that 5-nanometer and 7-nanometer in the past few years basically ramped in the middle of the year. N3, we said the ramp will be in second half of next year. So what is the reason behind this?
C. C. Wei - Taiwan Semiconductor Manufacturing Company Limited - CEO
Andrew, you have a very good observation and you calculate that, yes, about 3 to 4 months is a delay as compared with 5-nanometer. Yes, 3-nanometer technology actually is very complicated and in both processing technology and also the customers' product design. So we work with a customer, and finally, we decided to ramp up in the second half of next year. And this is -- we decided with our customer with the best fit their need.
what is this pentium D you guys are talking about?
You mean that space heater that sat next to your desk to keep your feet warm during winter?
It's kinda funny. That Pentium D 820 got 95W TDP. Current 12900KS got 150-240W TDP.what is this pentium D you guys are talking about?
You mean that space heater that sat next to your desk to keep your feet warm during winter?
It's kinda funny. That Pentium D 820 got 95W TDP. Current 12900KS got 150-240W TDP.
The Pentium was very mild compared to current heater technology.
witeken and tom's hardware, a match made in heavenThis is kinda getting into the weeds here. The original question we were trying to answer was: what did the Meteor Lake design teams believe about the suitability of N3 back in 2019? There's an obvious distinction between what industry observers might have said, and what TSMC actually shared with customers during that period. During the TSMC Q2 earnings call on July 18, 2019, C. C. Wei stated that:
I think we can safely assume that the teams at Intel were getting some information directly from TSMC and not just relying on whatever DigiTimes published. The first public statement from TSMC regarding N3 timelines came during the Q1 earnings call on April 16, 2020:
In the absence of clear evidence that TSMC told customers something materially different during the prior 12 months, I tend to believe that Intel was working with accurate information.
As far as Apple goes, they're even more up in TSMC's business, so I don't for a minute believe that they ever targeted N3 for any SoC that was intended to ship in 2022. And yes, anyone paying attention knew that Apple was going to bail on Intel at some point—by early 2018 I was already convinced that it was imperative for Apple to pursue their own SoCs for the Mac line.
However, if you look instead at what industry observers were saying in 2019, you'll find that some believed N3 would trail N5 by three years, and others thought the gap would only be two years. The fact that the editorializations around that time often don't line up with the sources being cited is evidence of that. Once TSMC announced that the target was H2'22, some believed this was pulling the node back in by 6 months or more, while others claimed it was arriving later than expected. Most people have no idea what Apple's production timelines look like, so they saw volume production in 2022 and just assumed the SoC for the 2022 iPhones would be manufactured on N3. Many of those who did understand the implications of H2 but were bullish on TSMC thought that surely TSMC would be able to deliver N3 a quarter or more ahead of schedule in order to accommodate Apple. @Doug S here still thinks there's a possibility that Apple used N3 risk starts to fabricate the A16.
Professional analysts continue to act confused by the H2'22 timeline. From the Q2 2021 earnings call:
Despite 5 quarters worth of consistent communication from TSMC, @witeken promptly latched onto the word "delay", claiming this was somehow a deviation from the public roadmap, and subsequently doubled down on it. Incidentally, you can also check out the editorialization from his own take on the IThome piece that he did for Tom's Hardware.
Well, if you want to sell to consumers in both the US and Japan, 1200 W is a more realistic limit (12 A @ 100 V for 1200 W continuous power). But it's pretty stupid for a single device to pull that much juice, because there's no chance that it will be the only thing that the typical end user plugs into a 15A branch circuit.There's a practical limit of 1500 W for all but like HPC.
Is this due to bad drivers? So far Sapphire Rapids have been matched against Rome based EPYC and Skylake Xeons and not performing as expected
![]()
Intel Sapphire Rapids-SP Xeon Platinum 8480+ 56 Core & Platinum 8450H 28 Core CPUs Tested In Quad-Socket Sever
Intel's Sapphire Rapids-SP Xeon Platinum CPUs have been tested in a quad-socket configuration, offering up to 224 cores & 448 threads.wccftech.com
View attachment 64453
It's not losing to Milan, but to Rome on many tests. I believe the dreaded Mesh of Rings that is taking out many of the IPC gains, plus the slow clocks.Yeah hopefully something up with preproduction hardware, or benches chosen that are not representative. Would be very disappointing for 56 core sapphire rapids to lose to 64 core Milan at 50% more power, because it will get slaughtered by Genoa if so.
Or maybe this is real and the HBM version will do better.
It's not losing to Milan, but to Rome on many tests. I believe the dreaded Mesh of Rings that is taking out many of the IPC gains, plus the slow clocks.
There have been multiple leaks Sapphire Rapids(ES and early samples) struggling with Rome based EPYCs with other benchmark apps like Cinebench R23I wouldn't read too much into this, in fact, I wouldn't read anything at all into testing with sandra, might as well just read userbenchmark editorials.
It's not losing to Milan, but to Rome on many tests. I believe the dreaded Mesh of Rings that is taking out many of the IPC gains, plus the slow clocks.
Those are QS Samples with full retail number. Do you think they would be locking those just before the release?(according to Yuuki_AnS the QS don't have SDSi locks)Maybe those are just Sapphire Rapids samples which are not completely unlocked (i.e. performance limited through SDSi). So essentially driver problems. Intel currently likes to invite those.