Sp12
Senior member
- Jun 12, 2010
- 799
- 0
- 76
So, running a ringbus over the top of a die doesn't actually increase size? Just complexity? What sort of effect will that have on yields compared to a traditional setup (if it affects them at all)?
Also, how does adding another stop increase the bandwidth of a ring bus. The 'channel' is still the same width, it just makes more stops. Does the Tokyo bullet train carry more people with every stop added?
Also, how does adding another stop increase the bandwidth of a ring bus. The 'channel' is still the same width, it just makes more stops. Does the Tokyo bullet train carry more people with every stop added?
Last edited:
