IntelUser2000
Elite Member
- Oct 14, 2003
- 8,686
- 3,787
- 136
Raichu/kopite7kimi: Arrowlake-S high end, Meteorlake-S low-mid.
Raichu: MTL-S and ARL-S coming almost the same time.
kopite7kimi: Meteorlake-S in Q1 2024.
Doesn't seem like terrible at all to me. This is just as I was speculating. They are doing this to speed up the process launch. I assume they will reduce the gap between process readiness and product releases as well.
According to Raichu and kopite7kimi MTL-S will be a mid to lowend Mainstream series for desktop while ARL-S is coming for the highend.
Raichu says MTL-S and ARL-S will come almost at the same time. Or it means MTL-S is more towards H2 2024 as well.
Raichu: MTL-S and ARL-S coming almost the same time.
Of course, that means Intel will be competing with reheated Alder Lake all the way till some indeterminate time in 2024, which is a terrible position indeed. Even when Arrow Lake comes,
kopite7kimi: Meteorlake-S in Q1 2024.
Doesn't seem like terrible at all to me. This is just as I was speculating. They are doing this to speed up the process launch. I assume they will reduce the gap between process readiness and product releases as well.
Last edited: