So it won't be?nyo.
So it won't be?nyo.
If it's not, that's a lot of time in the future to not be on 14aSo it won't be?
Indeed, 18A will be with us for a while.If it's not, that's a lot of time in the future to not be on 14a
Which I guess means external foundry hype about 14a is bullshit?Indeed, 18A will be with us for a while.
No, lol.Which I guess means external foundry hype about 14a is bullshit?
Hope it gets to 6.5 GHz some day.Indeed, 18A will be with us for a while.
18A? no.Hope it gets to 6.5 GHz some day.
Including 18AP…?18A? no.
Future nodes, yes.
and 18AUIncluding 18AP…?
That seems like a whopping downgrade if the transistors are nearly the diameter of Saturn's orbit! 😅and 18AU
Also, 18A-PT will feature in Coral Rapids and external foundry work.Including 18AP…?
18A-PT won't be featured in Coral if I have to guessAlso, 18A-PT will feature in Coral Rapids and external foundry work.
I don't think that's implied or likely. He would not call it E-Core for nothing.
Unified bit is later when they shift to fast/dense tracks.Sorry to play semantics but how is Copper Shark a unified core if it is glued in the same cpu as an E core ?
It would be the first P core made by the usually E core team, yeah but unified where ?
Have heard the same thing but will wait for confirmation. Initially it seemed the P-core was based on Griffin Cove but recently changed to Coppershark. Jaykihn's info appears to be different, for now at least.I know from a very good other source that Copper Shark is a P-core in TTL and Intels first unified core. As I said he might be confused because Copper Shark is also made from the E-core team. The E-core in TTL will be the "old" one from RZL because the more dense version isn't ready.
so TTL is just 6 months later than RZL? sounds fakeHave heard the same thing but will wait for confirmation. Initially it seemed the P-core was based on Griffin Cove but recently changed to Coppershark. Jaykihn's info appears to be different, for now at least.
There were rumors saying Intel would relax its client release cadence which might be correct. TTL seems to be mid-2028/around Computex rather than CES 2028 reveal.
A bit odd that P-core variant of Coppershark is ready but E-core variant isn't considering the major differences should be in Cluster-size/cache and density optimization. But TTL is still too far away so there's possibility of changes.
TTL is not 6 month after Razer Mobile cause Razor Mobile U/P/H Doesn't exist.so TTL is just 6 months later than RZL? sounds fake
SourceRazor Mobile U/P/H Doesn't exist.