I'd love to get final by the end of this year so we can catch the fleeting energy tax credit.
I can get that with the exterior and interior painted, the flatwork and stormwater items done outside, and inside:
1)Any kitchen sink in a chunk of counter.
2)a kitchen stove
3) (1) finished bathroom.
I'd need to have all safety rails up, but no flooring or cabinets or interior doors or trim, save that 1 bathroom.
Then I could take my time building my real kitchen cabs and bathroom cabs etc. Flooring as much as my back will tolerate at a time.
I'll know if that is possible by the end of October.
The carport will get framed, decked and ready for the roof membrane this week. I have the edge trim metal made and on site.

It is 24 ga PVDF painted steel with a 1/2" drip hem.
the vinyl roof membrane comes with an 1 3/4" molding that goes over the top edge of that. No painting any of these facia or barge boards it is all 24 ga steel.
Then I will get my neighbor welder started on fabbing stainless rail posts for cable safety rails. They face mount on that metal, no roof penetrations. He is down for that. We will set up jigs to make it quick and easy.