sciencewhiz
Diamond Member
I just noticed this on my Dnet client
[Sep 12 05:48:20 UTC] Completed OGR stub 25/3-1-15-12-14-23 (291,631,591,925 nodes)
0.14:00:14.91 - [3,416,216.01 nodes/sec]
[Sep 12 05:48:20 UTC] Loaded OGR stub 25/3-1-15-12-14-23 (2.50% done)
Is my work going to waste? Or if I do this stub twice, will the results count for both the first and second passes.
[Sep 12 05:48:20 UTC] Completed OGR stub 25/3-1-15-12-14-23 (291,631,591,925 nodes)
0.14:00:14.91 - [3,416,216.01 nodes/sec]
[Sep 12 05:48:20 UTC] Loaded OGR stub 25/3-1-15-12-14-23 (2.50% done)
Is my work going to waste? Or if I do this stub twice, will the results count for both the first and second passes.