Discussion Intel Meteor, Arrow, Lunar & Panther Lakes + WCL Discussion Threads

Page 502 - Seeking answers? Join the AnandTech community: where nearly half-a-million members share solutions and discuss the latest tech.

Tigerick

Senior member
Apr 1, 2022
850
801
106
Wildcat Lake (WCL) Preliminary Specs

Intel Wildcat Lake (WCL) is upcoming mobile SoC replacing ADL-N. WCL consists of 2 tiles: compute tile and PCD tile. It is true single die consists of CPU, GPU and NPU that is fabbed by 18-A process. Last time I checked, PCD tile is fabbed by TSMC N6 process. They are connected through UCIe, not D2D; a first from Intel. Expecting launching in Q2/Computex 2026. In case people don't remember AlderLake-N, I have created a table below to compare the detail specs of ADL-N and WCL. Just for fun, I am throwing LNL and upcoming Mediatek D9500 SoC.

Intel Alder Lake - NIntel Wildcat LakeIntel Lunar LakeMediatek D9500
Launch DateQ1-2023Q2-2026 ?Q3-2024Q3-2025
ModelIntel N300?Core Ultra 7 268VDimensity 9500 5G
Dies2221
NodeIntel 7 + ?Intel 18-A + TSMC N6TSMC N3B + N6TSMC N3P
CPU8 E-cores2 P-core + 4 LP E-cores4 P-core + 4 LP E-coresC1 1+3+4
Threads8688
Max Clock3.8 GHz?5 GHz
L3 Cache6 MB?12 MB
TDP7 WFanless ?17 WFanless
Memory64-bit LPDDR5-480064-bit LPDDR5-6800 ?128-bit LPDDR5X-853364-bit LPDDR5X-10667
Size16 GB?32 GB24 GB ?
Bandwidth~ 55 GB/s136 GB/s85.6 GB/s
GPUUHD GraphicsArc 140VG1 Ultra
EU / Xe32 EU2 Xe8 Xe12
Max Clock1.25 GHz2 GHz
NPUNA18 TOPS48 TOPS100 TOPS ?






PPT1.jpg
PPT2.jpg
PPT3.jpg



As Hot Chips 34 starting this week, Intel will unveil technical information of upcoming Meteor Lake (MTL) and Arrow Lake (ARL), new generation platform after Raptor Lake. Both MTL and ARL represent new direction which Intel will move to multiple chiplets and combine as one SoC platform.

MTL also represents new compute tile that based on Intel 4 process which is based on EUV lithography, a first from Intel. Intel expects to ship MTL mobile SoC in 2023.

ARL will come after MTL so Intel should be shipping it in 2024, that is what Intel roadmap is telling us. ARL compute tile will be manufactured by Intel 20A process, a first from Intel to use GAA transistors called RibbonFET.



LNL-MX.png
 

Attachments

  • PantherLake.png
    PantherLake.png
    283.5 KB · Views: 24,028
  • LNL.png
    LNL.png
    881.8 KB · Views: 25,522
  • INTEL-CORE-100-ULTRA-METEOR-LAKE-OFFCIAL-SLIDE-2.jpg
    INTEL-CORE-100-ULTRA-METEOR-LAKE-OFFCIAL-SLIDE-2.jpg
    181.4 KB · Views: 72,430
  • Clockspeed.png
    Clockspeed.png
    611.8 KB · Views: 72,318
Last edited:

jdubs03

Golden Member
Oct 1, 2013
1,282
902
136
Intel is about to go out of business because their fab has failed to execute time after time. If you were head of Intel do you still make important products to not yet production ready internal process without making back-up plan - dual source your products? I think that now every Intel product is dual sourced and tsmc version will be released on time if internal fab fails - which is more than likely.
Geez that’s a lot of gloom and doom. Sounds like the BoD meeting yielded some positive steps, and the Amazon deal helps a bit too. The $3.5 billion DoD Secure Enclave is providing funding to the fab side. They’re still awaiting the $8.5 billion tranche from the CHIPs act.
I think about to go out of business is a bit much.
 

511

Diamond Member
Jul 12, 2024
4,533
4,161
106
Just wait till intel to announce🤪they just did changed the ARL u5 u3 from 20a to full n3b.
Such changes doens't happen overnight they outsourced cause they had design ready bet AMD will be trouble with CLW they won't have Node advantage and Chadmont is not weak
 

naukkis

Golden Member
Jun 5, 2002
1,020
853
136
Geez that’s a lot of gloom and doom. Sounds like the BoD meeting yielded some positive steps, and the Amazon deal helps a bit too. The $3.5 billion DoD Secure Enclave is providing funding to the fab side. They’re still awaiting the $8.5 billion tranche from the CHIPs act.
I think about to go out of business is a bit much.
Money ain't have been problem in past failures. Intel is out of server business if their fab fails again. They switch their client business to tsmc and server side can make same switch - but only if decision to start backup plan is made early enough. After their fab fails is way too late to change plans - Intel is crazy if they have bet everything on one card without backup plans as they have already have bought needed capacity from tsmc.
 

511

Diamond Member
Jul 12, 2024
4,533
4,161
106
Money ain't have been problem in past failures. Intel is out of server business if their fab fails again. They switch their client business to tsmc and server side can make same switch - but only if decision to start backup plan is made early enough. After their fab fails is way too late to change plans - Intel is crazy if they have bet everything on one card without backup plans as they have already have bought needed capacity from tsmc.
Thier Fab failure means US will loose leading edge chip manufacturing which is a tall order imo anyway their fabs have been awesome pre 10nm they invented half the stuff TSMC copied hell TSMC N3 Uses a feature intel used in 22nm node lol they just need to get back on track and Design should have back-up in form of TSMC
The feature is SAC
 

jdubs03

Golden Member
Oct 1, 2013
1,282
902
136
They lied about 20A and ARL, why would anyone trust Intel.
I think it’s more more like a “trust but verify” situation. They can’t afford execution delays any longer, so one would hope they’re staying grounded.

The jury is still out on 18A.
 

mikk

Diamond Member
May 15, 2012
4,296
2,382
136
They kept saying everything was on track until the last minute, obviously they lied.

Who is to say anything out of Intel's slide wouldn't get changed at any time since they mean nothing?


No this is false, they simply ignored talking about 20A for months. It was on track maybe a year ago or something like that. It's not like they claimed on track shortly before they cancelled it you are implying.
 
  • Like
Reactions: controlflow

OneEng2

Senior member
Sep 19, 2022
840
1,107
106
No, you don't get it what Intel will just sell N3 wafers as 18A, theres no way they could launch a product, it's against the fundamental law \s
I don't know for a fact, but my guess is these advanced processor designs at Intel are betting on the transistor density and power efficiency of 18A in order to have a viable product offering.

I suspect that it is not possible for the design to exist on N3X..... so I agree with others ..... Intel has a whole lot riding on 18A.
 

cebri1

Senior member
Jun 13, 2019
373
405
136
20A was a derisking node, the same as Intel 4. The only difference being that Intel 4 has to be used for HVM of MTL. If not it would have gone already too.
 

Magio

Member
May 13, 2024
171
203
76
20A was by far the sanest cut to make for Intel. There were already almost no products slated to use it besides a few (likely low volume) ARL SKUs and it was certainly not slated to be offered to foundry customers. If they had infinite cash and infinite trust from investors then sure, go ahead with that to beta test GAAFETs and BSPD ahead of 18A HVM, but if you don't then reallocating those resources directly towards 18A is the only logical choice.
 

The Hardcard

Senior member
Oct 19, 2021
334
424
106
They kept saying everything was on track until the last minute, obviously they lied.

Who is to say anything out of Intel's slide wouldn't get changed at any time since they mean nothing?
That doesn’t mean they lied. “Every Thing Was On Track Until I Realized I Didn’t Have The Money” would work as the title of my autobiography or the summary of the contents.
 

Markfw

Moderator Emeritus, Elite Member
May 16, 2002
27,247
16,108
136
That doesn’t mean they lied. “Every Thing Was On Track Until I Realized I Didn’t Have The Money” would work as the title of my autobiography or the summary of the contents.
Except one thing. When was the last time Intel told the truth ?
 

9949asd

Member
Jul 12, 2024
139
96
61
Except one thing. When was the last time Intel told the truth ?
They actually do a good things to customers. Who wants to use their disadvanced node and experience 400w cpu🤣
No one want to pay for their fab, only want a good cpu.
 

Markfw

Moderator Emeritus, Elite Member
May 16, 2002
27,247
16,108
136
They actually do a good things to customers. Who wants to use their disadvanced node and experience 400w cpu🤣
No one want to pay for their fab, only want a good cpu.
When was the last time they did something good for customers ?
 
  • Like
Reactions: dr1337

IEC

Elite Member
Super Moderator
Jun 10, 2004
14,600
6,084
136
Vendor threads are considered safe spaces for owners and admirers of that vendors products. Anti vendor posts, and posts that are pro competitor of the vendor are not allowed. Because it amounts to flame bait.
 

Philste

Senior member
Oct 13, 2023
301
477
96
Looks like ARL will launch in 6 days anyway, the old Intel Innovation Slot.
 

Attachments

  • Screenshot_20240918_070109_Chrome.jpg
    Screenshot_20240918_070109_Chrome.jpg
    195.7 KB · Views: 35
  • Like
Reactions: 511