Got some progress done on garage since it was nice out today. This project is dragging on, everything I have to do ends up being tedious because of being hard to access, or some other issue and I'm constantly having to move stuff around to get the ladder where I need it so I find I spend more time doing that than anything. Got the attic hatch opening done, most of the wiring is done, and boxed in the areas where wires come down the walls so I have something to tie vapour barrier to. The boxed areas will be spray foamed. A few things left to do then I can actually start on the vapour barrier. Decided I will just do blown insulation, it will be easier to just do the vapour barrier all in one shot rather than try to put batts in at the same time. The blow gun should be able to reach the whole attic space from the opening.
The floor was starting to frost up making it super slippery so decided to call it quits. Going to be nice once I have that ceiling done though, it will help keep the heat in, even with the walls not yet insulated. That will be the next step after ceiling is done.