Where's the pics of the mounting of the inverter and charge controller? I feel so incomplete.
Not fully wired yet but here is a look inside, got the inverter part wired now, and it powers on and all the plugs work.
Tomorrow I'll do the solar charge controller wiring. I also ended up ordering a cut off switch from an online solar store, I bought what I thought was one at Canadian Tire, but it's just a quick disconnect cable and it's designed really weirdly at that, so going to return it. That was a waste of a lunch hour! I think you get like 30 days or something to return stuff so I'm just going to wait until I'm off, I don't want to waste another lunch break on that.
This is pretty much ready to go once I finish wiring it so doing a bit every night I should get it done. I might go to my property Friday after my shift and setup the tent and get settled in and start working on a basic shelter or at least start gathering lumber for one. I won't be there long enough to justify bringing tons of tools so will just bring bare minimum stuff. I start nights on Monday so only get 2 days really but at least it gives me 2 full days, if I leave town on Friday.
I need to consider buying an old beater car to leave in the driveway so it looks like someone's home if I plan to leave the house regularly like that though.