Modelworks
Lifer
- Feb 22, 2007
- 16,240
- 7
- 76
They just added that there were no reported structural problems on the bridge and that the current crew was just repairing the top layer.
That the engineers told them they would probably have to replace the entire road deck in 2020.
Boy was that estimate way off.
That the engineers told them they would probably have to replace the entire road deck in 2020.
Boy was that estimate way off.
