Ah ha, nothing so fancy or official, just a school engineering project. Been working on it for over a month. It's worth like 80% of our grade, and the prof was serious about being strict about the engineering design process so we need to submit a planning report with specifications, intended use, design features, what kind of power we needed, cost estimates, and the whole 9 years.
Our original specifications were that the entire assembly was to be less than 3x3 feet. However, the group responsible for the blade assembly, took that to mean the BLADES were to be 3x3 feet. So currently, we're a good 2 feet off of the specifications due to the fact that we need to shove in an entire generator and assorted electronics.
It's a simple vertical wind turbine. And currently the problem is, we are out of materials to use to create an alternate set of blades, and all that needs to be ordered online and machined. We simply don't have time for it, so we need to improvise.