imported_LandShark
Member
i have PVC tubing, and it is very difficult to squeeze onto the nozzles.
if i install the blocks first, i wont be able to get the tubing fitted without damaging the mobo.
my current plan is to measure the length, then cut and install the tubing to the blocks, then install the blocks to the mobo
what you guys think?
if i install the blocks first, i wont be able to get the tubing fitted without damaging the mobo.
my current plan is to measure the length, then cut and install the tubing to the blocks, then install the blocks to the mobo
what you guys think?