petrusbroder
Elite Member
- Nov 28, 2004
- 13,348
- 1,155
- 126
Originally posted by: Fardringle
I'm not as concerned about the pending credit (although it is annoying) as I am about the lack of credit in general. Including credit that has not yet been granted, I have only turned in a TOTAL of 23K points in the six days since the beginning of the month where even on a low credit project I should be getting at least 5K per day (about 30K total).
I agree. µFluid@home is a low yielding project in matters of credit. It is also a project which uses a lot of the processing power - I can see a 2 - 3ºC higher core temp when a computer is running µFluids only compared to e.g. MalartiaControl or Einsten or WCG.
I remember from the previous time TAS ran µFluid we saw a similar increase in core temps.
