• We’re currently investigating an issue related to the forum theme and styling that is impacting page layout and visual formatting. The problem has been identified, and we are actively working on a resolution. There is no impact to user data or functionality, this is strictly a front-end display issue. We’ll post an update once the fix has been deployed. Thanks for your patience while we get this sorted.

TAS-member thread for August 2008: Milkyway@Home

I switched over from SETI yesterday. It'll probably be 2 or 3 days before I totally clean out old seti work and ramp up production. Looking good already though. :evil:
 
Originally posted by: Alyx
I switched over from SETI yesterday. It'll probably be 2 or 3 days before I totally clean out old seti work and ramp up production. Looking good already though. :evil:

That's an understatement! You zipped right by me. I'm trying to talk the rodents into working their exercise wheels a little harder so I can catch up. Unfortunately, they're discussing unionization! Oh, well!
 
Here are the TeAm's stats.
Just now it may be a useless excersize to try to put other teams into the table - we are jumping teams so much that they just fly by.
When we are higher on the ladder I'll put the serious contenders in a different table.

___ Date _____ Position _____ Credits ______ Production ____ Change
________________________ in August ______ in August ___ in position
July 31, 2008 ____ 57 ______ 341 090 _____ _______ 0 ________ 0
Aug 01, 2008 ____ 51 ______ 422 983 ________ 81 893 _______ +6
Aug 02, 2008 ____ 45 ______ 546 170 _______ 205 080 ______ +12


We are #3 in the total production just now. Only SETI.USA and L'Alliance Francophone produce more on a day-to-day basis. 😀
 
One more day's crunching:

___ Date _____ Position _____ Credits ______ Production ____ Change
________________________ in August ______ in August ___ in position
July 31, 2008 ____ 57 ______ 341 090 _____ _______ 0 ________ 0
Aug 01, 2008 ____ 51 ______ 422 983 ________ 81 893 ________ 6
Aug 02, 2008 ____ 45 ______ 546 170 _______ 205 080 _______ 12
Aug 03, 2008 ____ 41 ______ 670 075 _______ 247 092 _______ 16

By tomorrow TAS will have doubled the TeAm's credits in MilkyWay. :beer:
That is what we call the TAS-effect.
The TeAm has the third largest production of all teams. 😀
 
stats are posted 🙂

Milestones:
Alyx = 100k
biodoc = 50k
Chocobo Navy = 1k,5k
Fardringle = 25k
Neurodog = 5k
petrusbroder = 25k
rabrittain = 1k
Rudy Toody = 75k
salvorhardin = 1k
Tom Philippart = 1k,5k

EDIT: Ooops, forgot my summary.
 
Congratulations, Alyx, on passing the 200K milestone!

I'll pat my own back, too. I just passed the 100K milestone!

Crunch On!

--Fred
 
Originally posted by: Rudy Toody
Congratulations, Alyx, on passing the 200K milestone!

I'll pat my own back, too. I just passed the 100K milestone!

Crunch On!

--Fred

Congrats RT and Alyx!:beer:

Alyx is already #17 in RAC for the project!:shocked:

Originally posted by: Philippart

wow milestones go fast with the projects credit distribution ^^

The points are indeed generous but not as bad as ABC@home.[img]i/expressions/face-icon-small-wink.gif[/img]

:beer:


 
Originally posted by: biodoc
Originally posted by: Rudy Toody
Congratulations, Alyx, on passing the 200K milestone!

I'll pat my own back, too. I just passed the 100K milestone!

Crunch On!

--Fred

Congrats RT and Alyx!:beer:

Alyx is already #17 in RAC for the project!:shocked:

Originally posted by: Philippart

wow milestones go fast with the projects credit distribution ^^

The points are indeed generous but not as bad as ABC@home.[img]i/expressions/face-icon-small-wink.gif[/img]

:beer:

Thanks! Good job RT!

I'm also #8 in project based on Weekly numbers, and its not even been a full week yet!

I don't think the points are that far off. Lower than ABC, and just slightly higher than seti, my daily stats are only about ~4k higher than what they were on Seti with optimized apps. They are drastically higher than uFluids though.
 
of course, since you're using the optimized apps at seti.

ufluids uses the stock boinc credit system, which should be the guideline for every project
 
Back
Top