Started finishing my basement, I'm almost done up to the point that I had planed for which is framing done, and dricore subfloor done + lot of misc stuff like electrical etc. Though honestly I figured a couple months not a year but missjudged given it was my first time doing any kind of work like that. I started around February. It was on and off though. A day here and there. Even though I get lot of time off with my job, by the time I account for everything else around the house that needs to be done like cleaning, laundry, shoveling etc it gives me only a few solid days per week. Though, I did do more than I had planed for. The server room is practically done and I was not really planing to touch that outside of maybe framing the partition walls.
I'm almost done this phase though. Next phase is spray foam and drywall but I will probably wait a few years for that as I'll want to save up. Same with server room hvac. I may even do the hvac this summer and do the foam next year.
Before:
After: (don't mind the newspapers, was just done painting)
UPS battery rack:
Cable management ducts:
Another side project will be redoing all the cabling. It's a mess behind there.
Still have odds and ends to tie but overall almost done the work I had planed for the rough in phase. This year will be time to start looking at getting back into some coding projects. I had given up my game server before I started on the basement so I'm thinking of starting another project like that.
The basement itself is pretty much done to the point I wanted. Fully framed and dricore is all installed except for a small corner I left to the last minute as it's where I've been cutting lumber and stuff. I start night shifts tomorrow, after that I'll probably finish off that section and cleanup and reorganize everything. It's a huge mess down there, tools everywhere etc... will be nice to get everything back in order.