I have a one minute presentation to perform. I have a diagram with several components. I will only be talking about two of these components due to time constraints.
Should I label all of them, and risk evaluators saying "Oh, you have this extra data on here you didn't even mention, what is it?"
or not put it on and risk them saying "That's great, but what context is this in? You didn't label some of the parts"
University, 2nd year. Engineering of Insulation in a Home. One overhead, hand drawn.
http://construction.tyvek.com/.../insul.layer_works.gif
I only have time for Insulation and the Housewrap. I figure I can skip studs, but don't know how important the sheathing is. I figure they know what bricks are, and drywall should be obvious.
Should I label all of them, and risk evaluators saying "Oh, you have this extra data on here you didn't even mention, what is it?"
or not put it on and risk them saying "That's great, but what context is this in? You didn't label some of the parts"
University, 2nd year. Engineering of Insulation in a Home. One overhead, hand drawn.
http://construction.tyvek.com/.../insul.layer_works.gif
I only have time for Insulation and the Housewrap. I figure I can skip studs, but don't know how important the sheathing is. I figure they know what bricks are, and drywall should be obvious.