Originally posted by: RussianSensation
I am sure just like ATI, Nvidia has multiple teams working on next generation GPUs. Besides, it's probably better to cancel an inferior gpu design and start from scratch rather than have other 5800 or 5900 failures.
I am sure Nvidia will just take one of their other team's chips and call it NV50. Just because the "original" NV50 has been cancelled, doesn't mean there wont be NV50. Besides, with the rate ATI is going, Nvidia can take 12 months to redesign the graphics card and X850XT PE still wont be in retail.
Perhaps the "old" NV50 was good enough to compete with R500, but what if they just aren't satisfied with competing, but want to become the leader again?
If car companies can take a concept car and turn it into a production model in 10-12 months, a videocard company can certainly design a full gpu from scratch in less than 6 months.