- Apr 2, 2007
- 5,664
- 0
- 0
http://www.vr-zone.com/article..._X2_Compared/5614.html
Hmmm, one thing that got me thinking is, if it's slated for launch at 18th of march, HOW is nvidia still determining the clockspeeds ? Shouldn't the videocards allready be assembled, packaged and being shipped as we speak ? Or how long does this usually take ?
And, we all know ATI usually scores better in 3dmark then we would expect them to compared to games. So 9800gx2 might have something going for it, although with it's ridiculous heatoutput and powerdraw it's probably still going to be a madmans card. Can't wait for the first real reviews to hit the net.
Hmmm, one thing that got me thinking is, if it's slated for launch at 18th of march, HOW is nvidia still determining the clockspeeds ? Shouldn't the videocards allready be assembled, packaged and being shipped as we speak ? Or how long does this usually take ?
And, we all know ATI usually scores better in 3dmark then we would expect them to compared to games. So 9800gx2 might have something going for it, although with it's ridiculous heatoutput and powerdraw it's probably still going to be a madmans card. Can't wait for the first real reviews to hit the net.