• We’re currently investigating an issue related to the forum theme and styling that is impacting page layout and visual formatting. The problem has been identified, and we are actively working on a resolution. There is no impact to user data or functionality, this is strictly a front-end display issue. We’ll post an update once the fix has been deployed. Thanks for your patience while we get this sorted.

math fun with your vcr

morkinva

Diamond Member
Okay, suppose you need to record a program that's 2 hrs 37 minutes long, using a 2 hr tape. You have 2 speeds to choose from, SP which would use up the full tape in 2 hrs time, and EP which if used exclusively would allow 6 hrs of recording. Speed SP uses 3 times as much tape per minute as speed EP.

At what point in time would you need to switch from SP to EP in order to exactly fill the tape for the 2hr 37min program?
 
Originally posted by: morkinva

At what point in time would you need to switch from SP to EP in order to exactly fill the tape for the 2hr 37min program?

Probably the same point in time where you realize that itd be easier just to tape the whole damn thing on EP
 
Originally posted by: ArmenK
1 hour, 41 mins, 30 seconds

Winnah!!


the 2 hr tape, for our purposes, is made up of x minutes plus (120-x) minutes. But at the point you switch from SP to EP, the remaining time is 3(120-x) minutes.

157 = 360-3x+x
203 = 2x
x = 101.5
 
Back
Top