- Nov 14, 2011
- 10,232
- 5,012
- 136
Another shake up, and this time it's Murthy out. Crazy times over there.
This is a bit more like it.
Another shake up, and this time it's Murthy out. Crazy times over there.
This is a bit more like it.
When the 10nm fiasco was realised, more heads should have rolled back then.
To be fair to Murthy he only joined in 2015 so was too late to make a difference with 10nm. But 7nm was totally his job, so good riddance.This is a bit more like it.
When the 10nm fiasco was realised, more heads should have rolled back then.
Instead they wasted another two years before kicking out this clown.
Going forward, the task of developing Intel’s 7nm and 5nm process nodes will be led by Dr. Ann Kelleher. Kelleher gets the incredibly important (but less-than-enviable) challenge of getting Intel’s fab development process back on track, as Intel seeks to regain its crown as the world’s leading chip fab. Kelleher was previously the head of Intel’s manufacturing group, overseeing the recent ramp-up of Intel’s 10nm process.
Type in current password: ****Meet the new boss, same as the old boss: