Originally posted by: VivienM
Originally posted by: btpenterprises
Intel hurry up and get these Conroe chips onto the market, because im dying here with this P3 600 in front of me. Everytime i plan to upgrade, something better comes along, and i wait, then i dont end up upgrading. This time i have money to splash, and im getting anxious to bye something. It better be worth the wait.
P3 600? Wow... you need a Conroe even more badly than I do... (my Conroe will be replacing a 1.9 Willamette...)
The "Order As Needed" box is why they will take your money now...the part can take as long as it takes (i.e. 6 months from now) for receipt in that price range, with no timeframe guarantee.