- Jun 17, 2002
- 1,820
- 4
- 81
I dont know if the past builds are good predictors on future release length,but my guess is about 2 years now???
If so Then I dont know what all the fuss is about GFX being "above DX9 spec", in that in 2 years the card will be scraping along anyways... beyond spec and all.
If so Then I dont know what all the fuss is about GFX being "above DX9 spec", in that in 2 years the card will be scraping along anyways... beyond spec and all.
