- Dec 4, 2003
- 397
- 0
- 76
This is the summer of my junior year in college and I am going to be home all summer working for my dad's business and need a project for the evenings as I will be working until 5-6 every day. We currently have a concrete slab patio on the back of our house which is not used very often because it's not very nice anymore. The door and sliding glass door are raised either 12-18" above the ground level and there are just steps going down to it. The steps and platforms are cracking and in need of replacing.
I was thinking that as a project I would remove (or have them removed) and build a wood deck that matches the floor level of our house. I plan to do this all on my own, and have access to power tools and saws and whatnot, I dont have any heavy machinery though. Is this a feasible project to undertake in 3 months time to basically accomplish on my own?
I was thinking that as a project I would remove (or have them removed) and build a wood deck that matches the floor level of our house. I plan to do this all on my own, and have access to power tools and saws and whatnot, I dont have any heavy machinery though. Is this a feasible project to undertake in 3 months time to basically accomplish on my own?