One wall is framed out and the frame painted. I'll work on the second wall tomorrow. I forgot to paint under the eves so I'll have to do that when I finish the second wall. This is going to be a enclosed blacksmith shop with perforated steel screens for the walls so the air can get in and the forge heat out. This time I took the perforated steel to be powder coated. The first time I used it (below) I primed and painted it myself. It took longer to prep the screen than it did to build the frame.
Sort of like this, but with a concrete floor and w/o the shelves attached to the cross members:
![]()