UsandThem
Elite Member
For most of us, spring (and higher temps) are close. I've seen several users mention they are quitting, or scaling back their folding until fall. With temps rising in NC, I'll soon have to cut my output in half. So before that happens, I wondered if anyone here wants to crank up their output for the next 14 days to catch SweClockers who are currently in 15th place?
As a team, we have doubled their output for a while now, and we have slowly been gaining on them. At our current output, we will pass them in 1.5 months. I think we can shorten that time. Our team rocked the Tom's challenge (more like a beat-down 😉 ), so I know we have the capability.
So who else wants to shrink that 812 million point gap?
https://folding.extremeoverclocking.com/team_overtake.php?s=&t=198
As a team, we have doubled their output for a while now, and we have slowly been gaining on them. At our current output, we will pass them in 1.5 months. I think we can shorten that time. Our team rocked the Tom's challenge (more like a beat-down 😉 ), so I know we have the capability.
So who else wants to shrink that 812 million point gap?
https://folding.extremeoverclocking.com/team_overtake.php?s=&t=198