Originally posted by: Syndicate
mines the same as everyone elses.
Opteron 144 @ 2.8ghz, 1gb 2-2-2-5 memory DFI Ultra-D
Stock score 3dM05 = 4058
Overclocked the X800 to 420/430 and got 4500 3dM05.
I pulled the stock cooler and used AS5. Dropped load temps from 68C to 58C. Suggested.
3DM05 has very little to do with CPU speed.
As far as I can tell it'll be impossible to flash this to X800XL and unlock 4 pipes.
Originally posted by: flylikeaneagle
I received an e-mail 2 days ago saying my rebate was valid and was being processed.
"
We just wanted to let you know we have received your rebate submission for $75 Mail in Rebate with Purchase of VisionTek Xtasy Radeon X800 128MB DDR PCI Express at Dell.
Your rebate tracking number is: 1XXXXXXXX"
rebatetrack@rebatetrack.com
Originally posted by: pieman7
I received a similar email as above, but clicked on the link and got the following:
Track Your Rebate
dots
Check Status of Rebate
Tracking Results: Status Details
Rebate: Variable Reward
Rebate Information For: XXXXXXXXXXX
Promotion: $75 Mail in Rebate with Purchase of VisionTek Xtasy Radeon X800 128MB DDR PCI Express at Dell
Submission Type: MAIL-IN
Date Received: 02-06-2006
Status Detail: Invalid.
Invalid Reason: Invalid Purchase Date
Rebate form says "Purchase must be made between 12/12/05 and 12/31/05". I've had forum members on this thread say that purchsing on 12/31 should be OK. But here's the deal - I actually purchased it at 11PM on 12/30, but the order acknowledgement emailed to me says "order placed 2005-12-31 05:51:35"! Does Dell go by GMT or something? ANyone else having this problem?
Thanks.
Originally posted by: Syndicate
I had the same problem with my rebate, they said it was invalid due to purchase date. Despite the fact that I ordered it on the right date. I called the number posted by Pieman and managed to get the guy to validate the rebate. IF you are having the same problem, do the same. He said 4-6 weeks then mailing time.
Originally posted by: Kro12
anyone get their checks yet? mine has been in final processing for a week or 2 now :/
Originally posted by: imhungry
Valid and scheduled sounds good at least?