Comment, and do it fast. It's now 16:03 as I'm typing this, and I want to have the stuff ordered before 21:00 (makes sure that I have the videocard, motherboard and powersupply here tomorrow or the day after).
AMD Opteron 165 boxed
DFI LanParty Ultra-D
G.SkiLL DDR500 @ 3-4-4-8 (250 MHz)
XFX nVidia GeForce 7800GT (the one with the fancy coloured lights)
Antec SmartPower 2.0 500W (with a whopping 38A on the 12V rail
)
Arctic Silver 5
Current case so people won't steal/masturbate over my new pc
Well, will it make me happy? Current specs are:
AMD Athlon 1400+ @ 1467 MHz
OEM PC2100 @ 2.5-3-3-7
Asus cheapo mobo (the old one died)
OEM 280W PSU
nVidia MX440 16 MB
confused:[/i])
Well, I ordered last night (couple of busy nights the nights before, so I could't order). I'll probably get the first batch Friday or Saturday (motherboard, PSU, graphics card, AS5), then I'll probably get the next batch the following Friday or Saturday (CPU), and the Monday or Tuesday after that, I'll get my memory, and the building can beginulate!
AMD Opteron 165 boxed
DFI LanParty Ultra-D
G.SkiLL DDR500 @ 3-4-4-8 (250 MHz)
XFX nVidia GeForce 7800GT (the one with the fancy coloured lights)
Antec SmartPower 2.0 500W (with a whopping 38A on the 12V rail
Arctic Silver 5
Current case so people won't steal/masturbate over my new pc
Well, will it make me happy? Current specs are:
AMD Athlon 1400+ @ 1467 MHz
OEM PC2100 @ 2.5-3-3-7
Asus cheapo mobo (the old one died)
OEM 280W PSU
nVidia MX440 16 MB
Well, I ordered last night (couple of busy nights the nights before, so I could't order). I'll probably get the first batch Friday or Saturday (motherboard, PSU, graphics card, AS5), then I'll probably get the next batch the following Friday or Saturday (CPU), and the Monday or Tuesday after that, I'll get my memory, and the building can beginulate!