Garage electrical panel starting to look half decent. Got the Christmas light circuit tied in so can turn those on now, skipping automation for now. Next is to run the PVC conduit for the ethernet feed to automation box and another conduit to go from that side of room to the other side so I can put the temp sensor for heat. Then need to run the lighting circuits and new switches and then the outside light circuits which I won't terminate this year but I'll just leave enough slack in the locations where lights will go. After that I should be done for anything that has to go in the ceiling and I can finally start to insulate. Would love to get that done before it gets colder. Already getting there and can only stand to work so much in the cold.