A bit of progress on my shed so far this week. I'm a little slow, but the floor is all done!
Put some plywood in each joist cavity to hold insulation and act as rodent block: (don't mind the big piece on top it was just stored there overnight)
Insulation:
Floor all done:
Might rain tonight so covered it up:
Doing this a little overkill by insulating it but I may potentially want to put some electronic equipment in there at some point like a solar setup and a backup NAS or something. So this extra step did add a bit more initial work for the floor.
Tomorrow I may take a break, if not, trusses are the next thing to start on so I can set them aside and have them ready when the walls are up. I can use the platform as a place to template them. Saw a video where they basically use small pieces of 1x2 screwed in the floor to build a jig so probably going to do that.
I really got lucky with the weather though, so far it has not rained. Suppose to tonight though, I hope it clears up by morning. It's a little too hot out for my taste but I won't complain at this point. This was the perfect week to take off. Totally lucked out.