- Mar 11, 2000
- 24,176
- 1,816
- 126
Huh? These were announced *today* and aren't supposed to ship until July. How could they be having trouble getting these units out?Originally posted by: raybay
Apple Macintosh is reportedly having a lot of trouble getting these new units out and available. Continuing problems with IBM's manufacturing continue to delay any real availability. IBM makes the CPU, and they are having some unusually long lasting production difficulties.
In fact, the main reason Apple probably chose to wait so long to announce these machines is because of those problems previously. (IBM announced the 2.5 GHz chip back in Feb.) However, I view the fact that Apple is now willing to announce these machines as a positive one that IBM has gotten to the point where the updated G5s can ship in volume. And the 970-based machines have been shipping on time ever since October.
The ones that haven't been shipping on time (since they were announced months ago) were the 970FX-based Xserves, but they started shipping in volume recently, too.
BTW, I expect the iMac to get a G5 announcement in 3 weeks. Those iMacs would use the 970FX as well.
