Text
This is a cutaway view of my house... not 100% to scale (at least my kitchen dosensent feel like 9x9x9
My back chimney really does go from my basement to eye level on the third floor. It's in really bad shape. It's also a shared chimney. My neigbhoring owner is a contractor and wants me to let him take it out at "zero cost to me." (clearly this is a get-it-in-writing kind of deal.)
The only thing that exhausts out of this chimney is my 15 year old, natural gas hot water heater. He suggested that I either get a new hot water heater and install PVC direct exhaust out the back of my basement. Alternativley, I think I could either run exhaust over to my main chimney.... (40 foot run?) or I could simply locate a new hot water heater near my main chimney. The first option is clearly the most preferable due to cost, but I have no idea if that's "code."
What do you guys think is the best approach for this?
The green lines represent the runs that would go along with each of the proposals... the green box represents the relocated hot water heater in option 3
This is a cutaway view of my house... not 100% to scale (at least my kitchen dosensent feel like 9x9x9
My back chimney really does go from my basement to eye level on the third floor. It's in really bad shape. It's also a shared chimney. My neigbhoring owner is a contractor and wants me to let him take it out at "zero cost to me." (clearly this is a get-it-in-writing kind of deal.)
The only thing that exhausts out of this chimney is my 15 year old, natural gas hot water heater. He suggested that I either get a new hot water heater and install PVC direct exhaust out the back of my basement. Alternativley, I think I could either run exhaust over to my main chimney.... (40 foot run?) or I could simply locate a new hot water heater near my main chimney. The first option is clearly the most preferable due to cost, but I have no idea if that's "code."
What do you guys think is the best approach for this?
The green lines represent the runs that would go along with each of the proposals... the green box represents the relocated hot water heater in option 3