minendo
Elite Member
Over a month ago my server's mobo died and it has been out of commission since, but that is about to change. 🙂
Just got the IDE controller I needed so now I am installing Windows. Going to serve as a file server, ftp server, backup server, and DC++ server. :beer:
The Specs:
Abit BP6
Dual Celeron 533
512mb Ram
1x10gb HD (OS drive)
3x160gb HD
1x200gb HD
Plan on adding more HD space by the end of next week.
Just got the IDE controller I needed so now I am installing Windows. Going to serve as a file server, ftp server, backup server, and DC++ server. :beer:
The Specs:
Abit BP6
Dual Celeron 533
512mb Ram
1x10gb HD (OS drive)
3x160gb HD
1x200gb HD
Plan on adding more HD space by the end of next week.