Assume:
- The dirt will start in a large pile
- I will be moving this dirt around on a ~1/3 acre lot
- I see they make many different models, so assume I'm using the smallest
- 8 hour day
- Dirt will be dumped in small piles around the lot and spread manually by someone who is not operating the Bobcat
Anyone with personal experience? If I'm going to rent the thing, I want to get as much use out of it as I can. I also don't want to end up with a huge pile of dirt left over