Originally posted by: aircooled
My company has a 9/80 shedule at work. 9 hours a day 80 hours a week, every other Friday off.
Great schedule.. it's thursday, but it's my friday. let the drinking begin!
HA I fvcked up. 80 hours per pay period.... I'll edit the original...Originally posted by: anno
Originally posted by: aircooled
My company has a 9/80 shedule at work. 9 hours a day 80 hours a week, every other Friday off.
Great schedule.. it's thursday, but it's my friday. let the drinking begin!
9 hours a day, 80 hours a week.. you have longer weeks there than we do in south carolina.
Originally posted by: bigredguy
so you work m-f 9 hours a day except for every second friday you have off?
Originally posted by: Bootprint
I hope you spend that time looking after poor white kitty.
Originally posted by: AvesPKS
I worked like that one summer, except I had every other Monday off. It wasn't worth it, though. For that one day off a week so I could get stuff done, I'd get home so late that
a) traffic would be so bad it'd add an extra 45 minutes to my commute
b) I'd be so tired I didn't feel like doing anything when I did get home and
c) even if I did feel like doing anything, it was so late that there really wasn't that much time to get anything done.
But to each his own.