4 5's less days. In fact 1 20 would be preferred if offered.
Must be nice - I used to work 6 12's much of my life.![]()
Ewww, I worked 6x12's for a year on 3rd shift and there wasn't much of a life at all.
The 6 12s that you and Tallbill worked would suck.4 5's less days. In fact 1 20 would be preferred if offered.
Must be nice - I used to work 6 12's much of my life.![]()
9 hour days (due to overlap/shift turnover), 7 days straight, rotating shift work, with a varying number of days off in between. A typical cycle is shown below:
Day 1-7 : Swing Shift, 1530-2330
Day 8-9: OFF (However, you start night shift at 2330 on Day 9. Essentially 1.5 days off)
Day 9-16: Night Shift, 2330-0730
Day 16-18: OFF (In this case, you get off at 0730 the morning of Day 16. Kinda like 3 days off.)
Day 19-26: Day Shift, 0730-1630
Day 27-28: OFF (Always a "normal" weekend. Off on Friday night, return Monday morning)
Day 29-32: Training Week, day shift 0730-1630
Day 33-37: OFF!!! (This is your 4-day. )
Repeat.
If I only worked 2 days per week, Ideally, it would be 2 x 10 hour days.
The 6 12s that you and Tallbill worked would suck.
I would hate working that much. For a while in my early 20s, after dropping out of college before I was on salary, I'd often work 50-60 hours and collect overtime .... but my 52 week rolling average hours stayed below 60 the whole time. I did do a stint of working 12 hours a day 7 days, every other week .... (overnight shift in tech support), at the end of that week I would be so drained and bored, I'd recharge on Monday, then my sleep would be all screwed up ...
neither. if i can't work a full 40-hr week, imma look for a new job.
I need to work to keep myself sane, but I could certainly be happy with about 20 hours or so a week. Just enough to give me a reason to wake up and to feel useful.
I think 4 hours a day 4-5 days a week would be great.
for i = 1:infinity
printf("Query");
end
