I'm not talking about when they come out and repave a whole section of a road. They actually do a decent job there so I can appreciate that. What I'm talking about is when they come and tear up the road, digging for pipes or whatever. When they're done they just toss some asphalt back on and maybe stomp on it a little. They either put too much and it becomes a speed bump or not enough and it's a damn pothole.
 

Scouzer

Lifer
Jun 3, 2001
10,358
5
0
why do any workers do a shitty job? why do your coworkers do a shitty job? why do you cut corners?
 

D1gger

Diamond Member
Oct 3, 2004
5,411
2
76
Because the work was done by a crew pushed too hard to be fast, with no pride in their work. If one of my crews did shitty work like you described, I would have them back digging it up and fixing it until they got it right.
 

fallensight

Senior member
Apr 12, 2006
462
0
0
There is a reason why there is the phrase "good enough for government work". Im many cases the guys who patch the hole after digging it, work for some state/local gov.
 

olds

Elite Member
Mar 3, 2000
50,114
776
126
Because it's very hard to match it up perfectly.
Asphalt that has been there a while is compacted very well by the initial installation and the constant traffic on it.
When you cut out a section and re-pave it, it is nearly impossible to achieve the same amount of compaction. To little and you have the bump. Too much and you have a dip.
If they leave it at the same level as the existing asphalt so that it is perfectly smooth, the traffic will continue to compact it leaving a dip.
 

mugs

Lifer
Apr 29, 2003
48,920
46
91
Originally posted by: oldsmoboat
Because it's very hard to match it up perfectly.
Asphalt that has been there a while is compacted very well by the initial installation and the constant traffic on it.
When you cut out a section and re-pave it, it is nearly impossible to achieve the same amount of compaction. To little and you have the bump. Too much and you have a dip.
If they leave it at the same level as the existing asphalt so that it is perfectly smooth, the traffic will continue to compact it leaving a dip.

Sounds about right.
 

Sphexi

Diamond Member
Feb 22, 2005
7,280
0
0
Originally posted by: oldsmoboat
Because it's very hard to match it up perfectly.
Asphalt that has been there a while is compacted very well by the initial installation and the constant traffic on it.
When you cut out a section and re-pave it, it is nearly impossible to achieve the same amount of compaction. To little and you have the bump. Too much and you have a dip.
If they leave it at the same level as the existing asphalt so that it is perfectly smooth, the traffic will continue to compact it leaving a dip.

Very true, and even worse in areas of the country where you get frost/frost-heaves in the winter. New asphalt is torn right up when that happens.


BTW, why do you no longer have an icon, just "Authors Icon" as a link?
 

Platypus

Lifer
Apr 26, 2001
31,046
321
136
so they'll have a job to do in a few months obviously.. that's how road crews work in this country
 

BoomerD

No Lifer
Feb 26, 2006
66,012
14,416
146
Originally posted by: oldsmoboat
Because it's very hard to match it up perfectly.
Asphalt that has been there a while is compacted very well by the initial installation and the constant traffic on it.
When you cut out a section and re-pave it, it is nearly impossible to achieve the same amount of compaction. To little and you have the bump. Too much and you have a dip.
If they leave it at the same level as the existing asphalt so that it is perfectly smooth, the traffic will continue to compact it leaving a dip.

True dat.

Also, another huge factor is because the city/county lets them. IMO, they should be required to return after a set period of time and fix the discrepency, (whether too high or too low) but that'll never happen...

What pisses me off is when they pave a road, get it all nice and smooth...then some dipshit contractor comes and tears it up to fix a pipe, install a new pipe, what ever...couldn't that have been done BEFORE they paved the dammed road? ;)



Originally posted by: IcebergSlim
union

you have a valid point...odds are, the union contractor does a far better job in compacting the fill under the asphalt patchm then takes the time to roll and compact the patch to match as closely as possible given the conditions...
 

Jeff7

Lifer
Jan 4, 2001
41,596
20
81
Originally posted by: Platypus
so they'll have a job to do in a few months obviously.. that's how road crews work in this country
Indeed. Do a lousy job the first time. Then, since it's government, they don't hold anyone accountable, so instead of it being fixed under some kind of warranty or guarantee, the road crew gets paid to fix their shoddy work. There's a lot of money to be made in perpetuating a problem.
 

Platypus

Lifer
Apr 26, 2001
31,046
321
136
Originally posted by: Jeff7
Originally posted by: Platypus
so they'll have a job to do in a few months obviously.. that's how road crews work in this country
Indeed. Do a lousy job the first time. Then, since it's government, they don't hold anyone accountable, so instead of it being fixed under some kind of warranty or guarantee, the road crew gets paid to fix their shoddy work. There's a lot of money to be made in perpetuating a problem.

yep
 

skyking

Lifer
Nov 21, 2001
22,720
5,844
146
Often, what you think is a lousy job of paving is not paving at all, but cold mix. This is a temporary patch material that can be placed and handled cold as the name implies.
Cold mix is used to allow the trench to naturally settle or compact, and to allow the contractor to consolidate the asphalt patching jobs from many trenches for one good dry day. Asphalt does not patch well under rainy conditions.
If the government in charge of the road system employs proper standards, the resulting patch should be relatively smooth to drive, and hold up well. Nothing will be as smooth as continuous paving, however.
 

villageidiot111

Platinum Member
Jul 19, 2004
2,168
1
81
Originally posted by: Sphexi
Originally posted by: oldsmoboat
Because it's very hard to match it up perfectly.
Asphalt that has been there a while is compacted very well by the initial installation and the constant traffic on it.
When you cut out a section and re-pave it, it is nearly impossible to achieve the same amount of compaction. To little and you have the bump. Too much and you have a dip.
If they leave it at the same level as the existing asphalt so that it is perfectly smooth, the traffic will continue to compact it leaving a dip.

Very true, and even worse in areas of the country where you get frost/frost-heaves in the winter. New asphalt is torn right up when that happens.


BTW, why do you no longer have an icon, just "Authors Icon" as a link?

I too only see "Authors Icon"
 

Linux23

Lifer
Apr 9, 2000
11,371
741
126
Originally posted by: Platypus
Originally posted by: Jeff7
Originally posted by: Platypus
so they'll have a job to do in a few months obviously.. that's how road crews work in this country
Indeed. Do a lousy job the first time. Then, since it's government, they don't hold anyone accountable, so instead of it being fixed under some kind of warranty or guarantee, the road crew gets paid to fix their shoddy work. There's a lot of money to be made in perpetuating a problem.

yep

QFT x 1000.

They have been working on the bridge by my house for the last 10 years. I can see them still doing road for 10+ more years until the job gets done.:roll: