What's the longest day of physical work you've ever done?

dug777

Lifer
Oct 13, 2004
24,778
4
0
I did 13 hours on the farm the other day, i've done 15 before at harvest time tho...

You sleep well ;)
 

pyonir

Lifer
Dec 18, 2001
40,856
321
126
Since I've never worked in IT, most i've done is 17.5

Edit: oh, i see you meant like labor work...not like employment work.

Probably 8 hours then.
 

brandonbull

Diamond Member
May 3, 2005
6,365
1,223
126
I was in the Navy and I worked 26 hours straight repairing electricial equipment. Oil leak into generator and switchboard.
 

mugs

Lifer
Apr 29, 2003
48,920
46
91
Probably 12 hours of physical labor, 16 hours of non-physical work. School work - 40 hours straight (on a single group project... I don't remember why we waited until the last minute :eek:).
 

Armitage

Banned
Feb 23, 2001
8,086
0
0
I worked a temp service job one summer that was 12 hours days 7 days a week - sometimes only 8 or 10 hours on Sundays. Killer OT!

I remember a few days working hay for 14+ hours. Loading trucks in the morning till the dew was off the fields, bailing all day, stacking into the barns into the night.
 

RCN

Platinum Member
Dec 31, 2005
2,134
0
0
13 hours was pretty standard for me when I did physical labor. Longest was 36 hours doing water damage restoration after a flood.
 

TallBill

Lifer
Apr 29, 2001
46,017
62
91
I dunno, probably 5 straight days of 16 hours of unpacking a cargo container, taking inventory, and repacking.
 

Shaotai

Platinum Member
Jan 22, 2002
2,062
0
0
Back when Nimda hit our company, we worked 14hrs+ days for almost 3 weeks... Almost killed me...
Because of that, it created the group that I now work in, Virus Management/IT Security! :)
 

Kerouactivist

Diamond Member
Jul 12, 2001
4,665
0
76
Originally posted by: dug777
I did 13 hours on the farm the other day, i've done 15 before at harvest time tho...

You sleep well ;)

I once dug sewer/water lines the morning (90 degree extremly humid conditions) I got home from college on no sleep at about 5am... the work was like 6am to 6pm........best sleep I've ever had when I finished up though....

 

blakeatwork

Diamond Member
Jul 18, 2001
4,113
1
81
17 in a construction job, but it wasn't constant... we'd have 5-10 minute breaks waiting for concrete trucks to show up..

spent the night in emerg when I lost feeling in my shoulder... fun...
 

bradruth

Lifer
Aug 9, 2002
13,479
2
81
10 hours straight or so working at my old summer job tarring & sanding streets in 90 degree heat.

15.5 hours straight for the PD.
 

murphy55d

Lifer
Dec 26, 2000
11,542
5
81
4am til 6:30pm is my longest day at work. Wal-mart distribution center... i work in the freezer no less.
 

intogamer

Lifer
Dec 5, 2004
19,219
1
76
Prolly like 24hrs there... non physical work... just neffing all day
naw what I mean?

haha j/k

I think I've had a few normal days with a 24hr time span
 

I Saw OJ

Diamond Member
Dec 13, 2004
4,923
2
76
I did a 15 hour shift at a grocery store where I used to work. Thanksgiving is a M Fer
 

PHiuR

Diamond Member
Apr 24, 2001
9,539
2
76
12 hours of shooting sports with a camera + telephoto lens without a tripod/monopod.
 

xSauronx

Lifer
Jul 14, 2000
19,582
4
81
about 19 hours or so. my dads drycleaning plant flooded and we worked from 5am to midnight the day after to get everything running so we could open up the next morning. 19 hours, the first half of which was cleaning the water and mud out of the place

then i did 18 hours once trying to repair a large dryer we had. 6 am to midnight on that one as well.
 

troytime

Golden Member
Jan 3, 2006
1,996
1
0
34 hours at MTX Audio (had to redo 4 sites 2 days before CES)

drank a case a mt dew, ate 2 boxes of twinkies

spent a lot of that time playing ping pong with my boss
 

vi edit

Elite Member
Super Moderator
Oct 28, 1999
62,484
8,345
126
Of actual true physically demanding work? Probably 12-14 hours helping labor for my father when he was putting in a foundation for his house.

Of non-physical, but still mentally demanding work, I was on the clock for 40+ straight hours after a server crash.
 

Gillbot

Lifer
Jan 11, 2001
28,830
17
81
22 hours doing electrical repairs and testing during an outage at my old plant.