Damn. I am at the sheetrock taping stage and it simply will not stop raining here. Something like 26 days in a row.
Need to get the exterior painted, the septic system in, the main power lines pulled through the conduit, the driveway poured etc., and much more rain is expected.
I am doing most of the work myself. I framed it, did the siding, the electrical, plumbing, network cable and phone wiring, and am going to do all the painting, finish work, tile, and the plumbing and electrical fixtures.
DAMN IT!
House Front
House Right
House Back
Upon popular demand I added more pics:
Excavation
FoundationSteel
Basement Floor
Basement Walls
Foundation
Foundation
Garage Floor
Main Floor
Upper Floor Framing
Truss Boom
Master Shower Plumbing
Master Vanity Plumbing
Recirc Pumps
Roof Framing
Front Door Inside
Great Room Inside
Master Bedroom Entry
Master Bath Tub Area
Need to get the exterior painted, the septic system in, the main power lines pulled through the conduit, the driveway poured etc., and much more rain is expected.
I am doing most of the work myself. I framed it, did the siding, the electrical, plumbing, network cable and phone wiring, and am going to do all the painting, finish work, tile, and the plumbing and electrical fixtures.
DAMN IT!
House Front
House Right
House Back
Upon popular demand I added more pics:
Excavation
FoundationSteel
Basement Floor
Basement Walls
Foundation
Foundation
Garage Floor
Main Floor
Upper Floor Framing
Truss Boom
Master Shower Plumbing
Master Vanity Plumbing
Recirc Pumps
Roof Framing
Front Door Inside
Great Room Inside
Master Bedroom Entry
Master Bath Tub Area