Just got of the phone from my supplier and i was told that the
new AMD Sapphire 7970 6gb Toxic will be out in a few days
and it has been rebuilt as far as how many connections are on it ?
And he mentioned about clock speed being raised, so time will tell.
shaynoa
How much ram do you need for triple 2560x1440 and some multisampling? Is this only going to be useful for compute?
How much ram do you need for triple 2560x1440 and some multisampling? Is this only going to be useful for compute?
AMDs new slogan for CPU/GPU lines... "moar cores, moar vram".
Its for powering 6 screens. Eyefinity 6.
So do I. Can you imagine Crossfire? Will this card require extra power?I wanna see reviews!
Perhaps this is AMD's response to stem the Nvidia GTX 680 demand?Yeah, and probably will be in 2-3 xfire configurations as well. I was actually surprised it took this long for them to be released.
For the price mentioned here, do you get some songs by Cassandra also?😎This will be mine
Before you get to the point where 3GB is not enough, your GPUs are completely maxed out. 2-3GB I get, 4GB as well. But 6GB is just senseless overkill that adds to power consumption and cost without any benefit.
Before you get to the point where 3GB is not enough, your GPUs are completely maxed out. 2-3GB I get, 4GB as well. But 6GB is just senseless overkill that adds to power consumption and cost without any benefit.
Just hope the reviewer has an Eyefinity 6 setup that he/she runs it on before writing the review.Jesus really? The card is for EYEFINITY 6.
Eyefinity 6.
Jesus really? The card is for EYEFINITY 6.
Eyefinity 6.
AMDs new slogan for CPU/GPU lines... "moar cores, more vram".
LOL yep! The only thing funnier than this are the people who will buy them.