See this image for reference:
http://pics.bbzzdd.com/users/bignateyk/ledger.jpg (http://hostedmedia.reimanpub.com/TFH/Projects/FH07FEB_FLABOA_01.JPG)
I am going to be installing a pergola attached to the house using a ledger board. I understand how the Drip Cap flashing and Z-Flashing works. That makes sense.
The part I don't understand is how the J-Channel and the vertical end of the ledger board works to prevent water from getting under the siding. Do I just caulk the hell out of the sides between the ledger board and the J-Channel? It seems to me the J-Channel wouldn't do anything to prevent water from getting under the siding along that vertical.
http://pics.bbzzdd.com/users/bignateyk/ledger.jpg (http://hostedmedia.reimanpub.com/TFH/Projects/FH07FEB_FLABOA_01.JPG)
I am going to be installing a pergola attached to the house using a ledger board. I understand how the Drip Cap flashing and Z-Flashing works. That makes sense.
The part I don't understand is how the J-Channel and the vertical end of the ledger board works to prevent water from getting under the siding. Do I just caulk the hell out of the sides between the ledger board and the J-Channel? It seems to me the J-Channel wouldn't do anything to prevent water from getting under the siding along that vertical.
Last edited:
