• We’re currently investigating an issue related to the forum theme and styling that is impacting page layout and visual formatting. The problem has been identified, and we are actively working on a resolution. There is no impact to user data or functionality, this is strictly a front-end display issue. We’ll post an update once the fix has been deployed. Thanks for your patience while we get this sorted.

probability problem

Semidevil

Diamond Member
so flaws in metal produced by high temperatures occure at a rate of 1 per 10 square feet. what is the probability that there is 3 or more flaws in a 8 x 5 feet.

ok, so I know we need to use poisson disstribution on this, e^-np * np^k/k!.

howver, I dont know my np.

so 1 per 10 square feet means 1 per 10 x 10 feet....maybe we can say this is the same as .1 per 1 x 1 feet.

so how do I put this in terms of 8 x 5 feet?

 
Are you using the Miller & Miller text? It sounds like a problem I had just a couple weeks ago. I'll take a look when I get home.
 
Originally posted by: upsciLLion
Are you using the Miller & Miller text? It sounds like a problem I had just a couple weeks ago. I'll take a look when I get home.

no...it's everyones favorite...Larson and Marx
 
Originally posted by: Semidevil
so flaws in metal produced by high temperatures occure at a rate of 1 per 10 square feet. what is the probability that there is 3 or more flaws in a 8 x 5 feet.

ok, so I know we need to use poisson disstribution on this, e^-np * np^k/k!.

howver, I dont know my np.

so 1 per 10 square feet means 1 per 10 x 10 feet....maybe we can say this is the same as .1 per 1 x 1 feet.

so how do I put this in terms of 8 x 5 feet?

this is a poisson ratio question isnt it? i forgot how to do them!, but i could beast any probablity question only a few months ago! its amazing how quickly u forget!

Po(lambda) where Lambda = np

if u get 1 in 100 8x5 is 40 so wont it be 0.4 per 8x5?


so Po(0.4) and then crack on with what ever the formula is again is is ?^r e^-? over something (forgot if its n! or just r or r!, i have no notes with me)

please note forum doesnt like the lambda sign so those ? u see are meant to be lambda!

edit: ah found it X - Po(?) = e^-? x ?^r / r!

ok so np or ?=0.4

and you want 3 or more flaws so that means you include three which means u do this

1 - P(X less than or equal to 2)

1 - [(e^-0.4 x 0.4^0 / 0!) + (e^-0.4 x 0.4^1/1!) + (e^-0.4 x 0.4^2/2!)]

that should be it

again i could be wrong
 
Lamda increases or decreases proportionally to the amount of sheet metal. So you have lamda = (1)(8*5/10) = 4. Otherwise otispunkmeyer's example is correct.
 
Originally posted by: upsciLLion
Lamda increases or decreases proportionally to the amount of sheet metal. So you have lamda = (1)(8*5/10) = 4. Otherwise otispunkmeyer's example is correct.


yeah u mention 10sq ft, im abit confused by this, i would take that as 10 and 8x5 as 40, so lambda = 4 and not 0.4

either way the method is correct
 
Originally posted by: otispunkmeyer
Originally posted by: Semidevil
so flaws in metal produced by high temperatures occure at a rate of 1 per 10 square feet. what is the probability that there is 3 or more flaws in a 8 x 5 feet.

ok, so I know we need to use poisson disstribution on this, e^-np * np^k/k!.

howver, I dont know my np.

so 1 per 10 square feet means 1 per 10 x 10 feet....maybe we can say this is the same as .1 per 1 x 1 feet.

so how do I put this in terms of 8 x 5 feet?

this is a poisson ratio question isnt it? i forgot how to do them!, but i could beast any probablity question only a few months ago! its amazing how quickly u forget!

Po(lambda) where Lambda = np

if u get 1 in 100 8x5 is 40 so wont it be 0.4 per 8x5?


so Po(0.4) and then crack on with what ever the formula is again is is ?^r e^-? over something (forgot if its n! or just r or r!, i have no notes with me)

please note forum doesnt like the lambda sign so those ? u see are meant to be lambda!

edit: ah found it X - Po(?) = e^-? x ?^r / r!

ok so np or ?=0.4

and you want 3 or more flaws so that means you include three which means u do this

1 - P(X less than or equal to 2)

1 - [(e^-0.4 x 0.4^0 / 0!) + (e^-0.4 x 0.4^1/1!) + (e^-0.4 x 0.4^2/2!)]

that should be it

again i could be wrong


?
 
Originally posted by: puffff
Originally posted by: otispunkmeyer
Originally posted by: Semidevil
so flaws in metal produced by high temperatures occure at a rate of 1 per 10 square feet. what is the probability that there is 3 or more flaws in a 8 x 5 feet.

ok, so I know we need to use poisson disstribution on this, e^-np * np^k/k!.

howver, I dont know my np.

so 1 per 10 square feet means 1 per 10 x 10 feet....maybe we can say this is the same as .1 per 1 x 1 feet.

so how do I put this in terms of 8 x 5 feet?

this is a poisson ratio question isnt it? i forgot how to do them!, but i could beast any probablity question only a few months ago! its amazing how quickly u forget!

Po(lambda) where Lambda = np

if u get 1 in 100 8x5 is 40 so wont it be 0.4 per 8x5?


so Po(0.4) and then crack on with what ever the formula is again is is ?^r e^-? over something (forgot if its n! or just r or r!, i have no notes with me)

please note forum doesnt like the lambda sign so those ? u see are meant to be lambda!

edit: ah found it X - Po(?) = e^-? x ?^r / r!

ok so np or ?=0.4

and you want 3 or more flaws so that means you include three which means u do this

1 - P(X less than or equal to 2)

1 - [(e^-0.4 x 0.4^0 / 0!) + (e^-0.4 x 0.4^1/1!) + (e^-0.4 x 0.4^2/2!)]

that should be it

again i could be wrong


?


heh lol, everytime i put it in it replaced it with ?, you have skills
 