Larrabee delayed until 2011 summer?

alyarb

Platinum Member
Jan 25, 2009
2,444
0
76
that's ok. i didn't want to see a demo with less than 40 cores, and given the area figure they quoted, it looks like they are shooting for 48. 32nm it is, then. i just want to see how it runs something as uniquely "unoptimized" as crysis or something like that. an architectural deviant like larrabee may have something to show.
 

alyarb

Platinum Member
Jan 25, 2009
2,444
0
76
although...

Originally posted by: anand
Remember the design experiment? Intel was able to fit a 10-core Larrabee into the space of a Core 2 Duo die. Given the specs of the Core 2 Duo Intel used (4MB L2 cache), it appears to be a 65nm Conroe/Merom based Core 2 Duo - with a 143 mm^2 die size.

At 143 mm^2, Intel could fit 10 Larrabee-like cores so let's double that. Now we're at 286mm^2 (still smaller than GT200 and about the size of AMD's RV770) and 20-cores. Double that once more and we've got 40-cores and have a 572mm^2 die, virtually the same size as NVIDIA's GT200 but on a 65nm process.

The move to 45nm could scale as well as 50%, but chances are we'll see something closer to 60 - 70% of the die size simply by moving to 45nm (which is the node that Larrabee will be built on). Our 40-core Larrabee is now at ~370mm^2 on 45nm. If Intel wanted to push for a NVIDIA-like die size we could easily see a 64-core Larrabee at launch for the high end, with 24 or 32-core versions aiming at the mainstream. Update: One thing we did not consider here is power limitations. So while Intel may be able to produce a 64-core Larrabee with a GT200-like die-size, such a chip may exceed physical power limitations. It's far more likely that we'll see something in the 16 - 32 core range at 45nm due to power constraints rather than die size constraints.

though that was written a year ago, it contrasts with the area data that is said to be encapsulated in a tomshardware rumor.
 

alyarb

Platinum Member
Jan 25, 2009
2,444
0
76
yes, but they've had test silicon for years that they need in order to build the software renderer. they claim even in august 2008 to have a 40-core at 370 sq mm.