Retail coolmaster (the kind that comes with a duron 600 to 700) hold long enough to test it, or should I wait 2-3 days for the volcano III's I ordered to come. The III is rated to 1.3 gig so I know it should work.
I do not know which coolmaster it is, I do not see any numbers on the side or top to tell me. I guess it is the lower one and it only has a single clip.
As I read on the dp5 5g11b goes up to 1.1 gig for an Athlon (t-bird??) and 900 duron.
I do not know which coolmaster it is, I do not see any numbers on the side or top to tell me. I guess it is the lower one and it only has a single clip.
As I read on the dp5 5g11b goes up to 1.1 gig for an Athlon (t-bird??) and 900 duron.