I have a raptor 74gb SATA drive I have been booting with. I would like to add an IDE drive I had sitting around. When I hooked up the IDE drive it booted from it (it had windows installed on it a long time ago.
How can I make it so that when I boot it loads from the faster raptor drive? I know about primary/slave with IDE cables but Id on't know how to work SATA in to the picture.
How can I make it so that when I boot it loads from the faster raptor drive? I know about primary/slave with IDE cables but Id on't know how to work SATA in to the picture.