How much longer do I have to wait for a wider array of nForce 4 boards to be out? It's driving me crazy just sitting here waiting. I'm especially interested in that DFI board but there might be others that can pop up and take me by surprise. I have a 300w Antec PSU, can it run a nForce4 system?