I need to pour some footings at my house for my deck and I have 6 footing 12" round by 48" deep. Using v=pi*h*(r*r) I came up that each footing is 5,425cubic inches there are 1728 cubic inches in a cubic foot, so that is apprx 3.1 cubic feet per footing. By guessing an 80# bag of ready-mix concrete I should be able to get 2 cubic feet per bag. from experience I know for a fact I'll need more than 2 bags to fill the footing. Where in my measurments am I wrong.... On the preform tube it says I should need about 4 bags for each footing(seems about right)