- Sep 5, 2003
- 19,458
- 765
- 126
According to Anand in one of his recent articles, BD is delayed until late July as AMD has to spin a B2 stepping.
![]()
It's worse than that. It appears it has been delayed at least until September, possibly even beyond that.
Xbitlabs has the story.
The fact that there's not even a hint being given of what's wrong certainly doesn't instill much confidence.
"The currently available B0 and B1 stepping Zambezi/Bulldozer processors can function at around 2.50GHz/3.50GHz (nominal/turbo) clock-speeds and at such frequency they cannot deliver performance AMD considers competitive, a person with knowledge of the situation said on Monday. As a consequence, AMD needs to tune the design of the processor and create B2 stepping of the chip with better clock-speed potential amid similar thermal design power (TDP), which will take several months to complete. Therefore, the Sunnyvale, California-based chip designer will release its highly-anticipated Bulldozer processors for desktops in September, not in June, as planned."
Last edited:
